Interlinking of Rivers

Car Rental Udaipur | Taxi Cab Booking Udaipur | Jaipur - Udaipur Taxi fare

Posted by Rajasthan Cab on November 06, 2019

 
Forum Post

Car Rental in Udaipur is now very easy with Rajasthan Cab. You just need to few clicks of the Internet and you can easily get Taxi in Udaipur on best rates. Call for any Udaipur taxi query on +91 9358811941

Interlinking of Rivers

Ken Betwa Link

Posted by Susan Sharma on May 03, 2017

 
Forum Post
  • The figures on the water availability in the Ken and Betwa rivers and their water balance have not been shared in the public domain and remain shrouded in secrecy. The Detailed Project Report (DPR) has been prepared by the project proponent and, against all good practices, no independent study has been commissioned on the project. An analysis by the South Asia Network on Dams, Rivers and People shows that less than 10 per cent of cultivable land in Bundelkhand will benefit from the project, even if the questionable claims on paper are taken on face value. In reality, this is likely to be even less, since, as noted in the Forest Advisory Committee meeting minutes of March 30, 2017, few Indian hydroprojects, if any, have delivered their claimed promises.
  • Quote from https://sandrp.wordpress.com/2017/05/03/open-letter-of-protest-on-ken-betwa-project-to-moef/

Interlinking of Rivers

Ken Betwa Link

Posted by Susan Sharma on May 03, 2017

 
Forum Post

As compensation for the pristine tiger habitat that would be inundated by the project, the Water Ministry had agreed to acquire about 8,000 hectares of forest land from the Madhya Pradesh government and revive them as forest.

But the FAC said this land was not good enough as it was fragmented, and, to meaningfully revive a forest that is part of tiger habitat, the land acquired ought to be contiguous. This would require, according to the FAC, “revenue lands/non-forest lands by way of purchase or otherwise by the project proponents and the government”.  Read more at

http://www.thehindu.com/news/national/ken-betwa-link-hits-green-hurdle/article17875371.ece

Interlinking of Rivers

Four Rivers evangelists now tight-lipped about disastrous project-Korea

Posted by Susan Sharma on August 13, 2014

 
Forum Post
"Pervasive algal blooms and invasive bryozoans. Bedrock collapsing from excessive dredging. A mountain of debt for the Korea Water Resources Corporation (K-water). A host of problems are emerging with the Four Major Rivers Project, the massive effort pushed under the administration of former president Lee Myung-bak (2003-08). But the politicians, officials, and experts who pushed for the project, which started out as an idea for a “Grand Korean Waterway,” are showing no sign of regret or reflection.

Most of the major proponents of the project under the Lee administration were tight-lipped or evasive when the Hankyoreh contacted them on July 8 and 9. Some argued for waiting before coming to a final judgment on the project; others argued for channeling even more money into it."

Interlinking of Rivers

Supreme Court go-ahead for interlinking rivers

Posted by Susan Sharma on February 28, 2014

 
Forum Post
The apex court of India has given the go ahead for the controversial inter-linking river project, seeking to transfer water from surplus to water deficit areas in the country. In its final judgement dated February 27, 2012, a three-member bench, headed by the chief justice of India, expressed the “pious hope of speedy implementation” to bring the project to a success. The project, in the pipeline since 1980, has been touted by the Centre as one solution to a number of problems: making water available for irrigating 35 million hectares; enabling full use of existing irrigation projects; generating power to the tune of 34,000 MW with added benefits, including flood control.
Read full report at
http://www.downtoearth.org.in/content/supreme-court-go-ahead-interlinking-rivers

Interlinking of Rivers

Ganga-down to Earth

Posted by Dr.Susan Sharma on April 18, 2013

 
Forum Post
............."The games started. IIT-Roorkee, represented by its Alternative Hydro
Energy Centre, disputed our conclusions. We asked why? No data was
provided on the method of estimation. But hidden in the background
sheets provided by IIT-Roorkee was data from two projects of
hydrological flow used to disprove our figures. We checked. We found to
our shock that figures of flow had been modified; suddenly there was no
water in the river in the first place, so a higher e-flow regime would
naturally mean lower energy generation. We checked again. We found that
even levelised tariff figures had been “changed” from what was provided
earlier to the committee.".....


http://www.downtoearth.org.in/content/training-engineers-not-ganga

Interlinking of Rivers

Panel on linking of rivers

Posted by Susan Sharma on February 28, 2012

 
Forum Post
The Supreme Court on Mondaydirected the Centre to constitute a ‘special committee' forthwith for inter-linking of rivers for the benefit of the entire nation.

It said: “The NCAER report clearly opines that the interlinking of river projects will prove fruitful for the nation as a whole and would serve a greater purpose by allowing higher returns from the agricultural sector for the benefit of the entire economy. This would also result in providing varied benefits like control of floods, providing water to [the] drought-prone States, providing water to a larger part of agricultural land and even power generation. Besides … benefits to the country, it will help the countries like Nepal etc., uplifting India's international role. Importantly, they also point to a very important facet of interlinking of rivers, i.e., it may result in reduction of some diseases due to the supply of safe drinking water, and thus serve a greater purpose for humanity.”

Read more at
http://www.thehindu.com/news/national/article2937800.ece

Interlinking of Rivers

Ganga River Action plan

Posted by Dr.Susan Sharma on July 10, 2010

 
Forum Post
For the first time, seven Indian Institutes of Technology will prepare a comprehensive river basin management plan for Ganga.

While earlier the Union Ganga River Basin Authority was looking upon international agencies to produce the plan which would include not only a blueprint of the sewage systems along the basin but also the dams that are being planned, the joint bid by IIT swung it in favour of Indian engineers. The river basin plan will aim to have adequate provision for water and energy in the Ganga basin to accommodate the pressures of increased population, urbanization, industrialization and agriculture while ensuring the sanctity of the fundamental aspects of the river system are protected. The twin demands of perennial flow and clean waters would be the two benchmarks to be met.

Read more at
http://iitdalumni.com/NewsDetail.aspx?NewsID=97

Interlinking of Rivers

Dams Coming Down in U.S!

Posted by Susan Sharma on January 23, 2008

 
Forum Post

Dams Coming Down

 

Two years of closed-door negotiations between farmers, Indian tribes, fishermen, conservation groups and government agencies have resulted in an unprecedented (but very conditional) agreement to remove four hydroelectric dams now operating along an embattled 300-mile stretch of the Klamath River in southern Oregon and northern California. The goal of the dam removal is to restore runs of the now-endangered salmon that were once plentiful in the region and to re-assign contentious water usage rights throughout the region accordingly..............

 ...........................................

 

Though it was once the third-most productive salmon river on the West Coast, the Klamath has suffered over the last several decades as a result of misguided hatchery practices, overfishing, development and the loss of habitat to dams, mining and logging. For the dams to actually be removed, the federal government would have to approve the dam removal plan (and put up the estimated $400 million to cover costs). Then, if dam owner PacifiCorp (a major regional utility) is willing to go along with the plan, the dams could be removed as soon as 2015.

 

 

Source:  http://www.emagazine.com/view/?4054

Interlinking of Rivers

Bihar takes lead in reviving river interlinking project

Posted by Susan Sharma on October 03, 2007

 
Forum Post

 

Three years after the Central government virtually abandoned the mega project of inter-linking of rivers, the government of Bihar is coming out with a proposal to link various river basins within the state.

Gujarat, too, is toying with a similar idea. What’s more, Tamil Nadu chief minister M Karunanidhi recently said that the linking of the southern rivers — Godavari, Krishna and Cauvery — could be taken up immediately...............

Satish C Jha, chairman, special task force on Bihar and a member of PM’s Economic Advisory Council, told SundayET that a better understanding with Nepal was key to control flood in the state and also evolve a better system of irrigation................

Former head of the task force on inter-linking of rivers Suresh Prabhu argued that it should be a two-way approach. “What Bihar is doing now is a bottom-up approach. We need that too. Inter-linking of rivers should be done in an intergrated manner involving both augmentation and conservation,” said Mr Prabhu.

Source : http://economictimes.indiatimes.com/Bihar_takes_lead_in_reviving_river_inter-linking_project/articleshow/2094715.cms


 

Share this page:
Page 1 of 6 1 2 3 4 5 6

Join Us    

Download IWC Android app     IWC Android app



Copyright © 2001 - 2023 Indian Wildlife Club. All Rights Reserved. | Terms of Use

Website developed and managed by Alok Kaushik